十二、暖通工程施工方案.doc
進入下載頁
1、暖通工程概況
該工程一至十六層為研究、實驗、辦公部分,通風(fēng)空調(diào)采用風(fēng)機盤管加新風(fēng)系統(tǒng),每層設(shè)2臺新風(fēng)機組,B1層為設(shè)備部分,內(nèi)設(shè)空調(diào)機房,采用大風(fēng)道系統(tǒng)南北各設(shè)軸流風(fēng)機1臺。
2、施工組織
2.1 勞動組織準備:本工程的總包方為北京××建設(shè)工程有限責(zé)任公司第××項目經(jīng)理部,機電設(shè)備部分分包給北京××公司水電分公司,在總包方統(tǒng)一領(lǐng)導(dǎo)下開展工作,針對新承包的工程項目,配備相應(yīng)施工人員,建立施工管理體生活費,對工程進度,質(zhì)量進行嚴格控制,保證施工順利進行,各專業(yè)、項目設(shè)有專業(yè)人員專業(yè)管理。
2.2 技術(shù)準備:組織技術(shù)人員熟悉施工圖紙和有關(guān)的設(shè)計資料,對相關(guān)的技術(shù)、經(jīng)濟和自然條件進行調(diào)查分析、研究可行的施工方案。針對圖紙中存在的問題及時記錄,為施工作出準確的、科學(xué)的技術(shù)指導(dǎo)。
2.3施工現(xiàn)場準備:施工道路、施工用水、施工用電和加工場地由總包方統(tǒng)一規(guī)劃,生產(chǎn)、辦公、生活用房等臨時用房由總包方提供。
2.4本專業(yè)空調(diào)系統(tǒng)由施工班組加工、制作、安裝、保溫,根據(jù)專業(yè)
1, HVAC Engineering Overview
The six works from 1 to 10 for research, experiment, office parts, ventilation and air conditioning with air fan coil system, 2 sets of each floor of new air unit, B1 floor for equipment parts, equipped with air-conditioned room, with strong winds located north and south of Road System axial fan 1 set.
2, construction organization
2.1 The labor organization and preparation: The project's general contractor for the construction of Beijing × × × × a limited liability company's first project management department, the mechanical and equipment to the Beijing × × sub-division of water and electricity, the total package to work under the unified leadership of party for the new contracted projects, with appropriate construction personnel, construction management body set up cost of living, on the progress of the project, strict quality control to ensure the smooth construction, professional, project management with professional expertise.
2.2 Technical Preparation: Organization and technical personnel familiar with the construction drawings and related design information on the relevant technical, economic and natural conditions of investigation and analysis of viable construction plan. Problems for drawing time record for the construction of an accurate, scientific technical guidance.
2.3 to prepare the construction site: Construction of roads, construction of water, electricity and construction of processing facilities by the total package side of unified planning, production, office, living rooms and other temporary buildings provided by the total package.
2.4 The professional air conditioning system consists of the construction team processing, production, installation, insulation, according to professional