      一、 主廠房區域基礎開挖特點:
      1、 根據地質資料,主廠房區域地表下的淤泥層深達10m,主廠房基礎一般座落在③淤泥質粉質土層中。本工程土建結構位于軟土地基上,樁基保護是本工程土建基礎施工的一大重點和難點。
      2、 主廠房內部基礎埋深相差較大,汽機基礎比汽機間框架基礎深3.5m;凝泵坑基礎比汽機基礎深0.5m;循環水閥門井及其相鄰的A排基礎底板整體現澆,底標高比汽機基礎深1m、比A排其它基礎深4.5m;A排外進排水管比A排其它基礎深2.9m。這些布置特點,大大增加了土建地下部分的施工難度,給樁基保護提出了更高的要求。
      3、保證樁基不發生位移偏位現象,擬采取必要的支護措施即水泥攪拌樁支護方案,在主廠房基坑四周布置多排水泥攪拌樁,形成水泥土擋墻。
      4、土方開挖底標高已低于地下水位,淤泥質土層的透水性很小,降水效果不明顯。 
      二、 支護方案
      1、 在主廠房基坑周邊、煙囪基坑周邊、循環水管溝基坑周邊,布置水泥攪拌樁。
      鍋爐房、除氧煤倉間、汽機房(除A排)基坑,布置四排雙頭水泥攪拌
      First, the foundation excavation of the main powerhouse features:
      1, according to geological data, the main plant area of surface layer of silt under the deep 10m, based on generally located in the main building ③ silty soil. The civil works structures located in soft soil, pile protection is the basis of the civil works construction of a major important and difficult.
      2, the main difference between the plant and the basis of depth greater than the steam turbine steam turbine foundation based on inter-frame depth 3.5m; condensate pump steam turbine foundation pit of deep foundation than 0.5m; recycled water wells and the adjacent A valve arrangement of the base as a whole is casting, the bottom elevation than the turbine foundation depth 1m, other than the basic A row of deep 4.5m; A exclusion into the basis of drainage other than the A row of deep 2.9m. The layout features, which greatly increased the difficulty of civil underground construction, pile protection to a higher demand.
      3, to ensure that displacement does not occur pile deviation phenomenon, to be taken the necessary support measures that support the program of cement mixing pile, arranged around the pit in the main plant more rows of cement mixing to form a cement retaining wall.
      4, the end of earth excavation below the water table elevation has, silty soil permeability is small, the precipitation effect was not obvious.
      Second, support programs
      1, in the main plant around the foundation, chimney foundation pit, circle pit around the pipe trench, decorated cement mixing pile.
      Boiler room, oxygen removal coal bin, the steam room (except row A) excavation, cement-head arrangement of four rows
       

      下載地址

      前往下載

      主站蜘蛛池模板: 亚洲综合91社区精品福利| 亚洲无码综合网| 国产色偷丝袜婷婷无码麻豆制服 | 亚洲AⅤ色无码乱码精品| 亚洲欧美国产精品久久久久久久| 2021精品国产综合久久| 爱情岛亚洲论坛成人网站| 亚洲精品成人无| 麻豆国产成人AV在线播放| 日韩顶级metart裸体自慰| 西西人体大胆瓣开下部69| 久久亚洲中文字幕不卡一二区| 国产亚洲精品AA片在线爽| 亚洲人成人网| 看污网址| 在线永久看片免费的视频| 国产成人免费一区二区三区| 国产精品视频一区二区噜噜| 亚洲三级香港三级久久| 欧美日韩中文字幕无码| 国产精品亚洲国产精品| 人妻夜夜爽天天爽三区丁香花| 最新日韩无码中文字幕| 日韩一区二区网站| 国产精品视频白浆免费视频| 88久久久久无码国产精品| 人妻?日韩?中文?无码?制服| 日本高清视频wwww色| 亚洲中文字幕久久一区| 成人动漫综合网| 亚洲大尺度一区二区三区| 26uuu亚洲电影最新地址| 亚洲乱人伦中文字幕无码| 国产超碰无码最新上传| 国产精品成人va在线观看| 四虎影视国产884a精品亚洲| 久久精品国产只有精品96| 国产午夜精品福利91| heyzo一区二区三区| 午夜福利无码不卡在线观看| 国产精品自在线拍国产手青青机版 |