④預(yù)制構(gòu)件安裝
A預(yù)制混凝土構(gòu)件應(yīng)符合設(shè)計(jì)圖和國(guó)家標(biāo)準(zhǔn)GB50204-2002《混凝土結(jié)構(gòu)工程施工及驗(yàn)收規(guī)范》的規(guī)定。
B構(gòu)件混凝土澆筑完畢后,應(yīng)標(biāo)注構(gòu)件的型號(hào)和制作日期,對(duì)于上、下難以分辨的構(gòu)件尚應(yīng)注意“上”字,并應(yīng)標(biāo)注在統(tǒng)一的位置上。
C預(yù)制構(gòu)件進(jìn)場(chǎng)要檢查板端是否堵孔(進(jìn)入板端4cm堵孔),如未堵應(yīng)補(bǔ)堵,樓板有裂縫者,不得使用。預(yù)制構(gòu)件安裝鋪放后,支座用水淋濕,再用10厚1:2.5水泥砂漿坐漿,安裝時(shí),構(gòu)件留40-60mm板縫,內(nèi)附加1φ8鋼筋,縫內(nèi)采用C20細(xì)石砼澆灌密實(shí)。板縫施工層不能在結(jié)構(gòu)施工層進(jìn)行,以避免板的變形,振動(dòng)影響板縫質(zhì)量。
④ Install prefabricated
A precast concrete elements should be consistent with design drawings and the national standard GB50204-2002 "Concrete Structures for construction and acceptance" requirement.
After concrete placement component B, component should be marked on the model and production date, for the upper and lower still difficult to distinguish the component should be noted that "on" and the words should be marked in a unified position.
C prefabricated panel-side approach to check whether the plug hole (hole blocking access to board-side 4cm), should be completed without blocking, block, slab cracks were not used. After laying precast installation, bearing water wet, then 10, sat thick 1:2.5 cement slurry, installation, components remain 40-60mm seams, within the additional 1φ8 steel, rock fissures using C20 thin dense shrub Tong Jiao . Construction floor slab joint construction layer in the structure can not, in order to avoid distortion of the plate, vibration seams quality.