綜合樓室內(nèi)裝飾工程施工組織設(shè)計(jì)(詳細(xì)).doc
進(jìn)入下載頁(yè)
施工組織設(shè)計(jì)
目錄
第一章 工程概況 8
1.1工程概述 8
1.2 施工工期及工程質(zhì)量標(biāo)準(zhǔn) 8
1.3 施工組織設(shè)計(jì)編制依據(jù) 8
1.4編制原則 10
1.5編制說(shuō)明 11
第二章 施工指導(dǎo)思想及準(zhǔn)備 12
2.1 項(xiàng)目施工準(zhǔn)備 12
2.1.1技術(shù)準(zhǔn)備 12
2.1.2施工隊(duì)伍進(jìn)場(chǎng)準(zhǔn)備 13
2.1.3對(duì)各專(zhuān)業(yè)工人技術(shù)水平要求 13
2.1.3.1對(duì)工人素質(zhì)的控制措施 14
2.1.3.2擬用于本工程各專(zhuān)業(yè)施工班組及相關(guān)管理措施 15
2.1.3.3對(duì)各專(zhuān)業(yè)工人技術(shù)水平要求 16
2.1.4工人進(jìn)場(chǎng)的管理 18
2.1.5地盤(pán)準(zhǔn)備 19
2.1.6裝修材料準(zhǔn)備 20
2.1.7對(duì)材料質(zhì)量的進(jìn)場(chǎng)控制 20
2.1.8主要材料進(jìn)場(chǎng)計(jì)劃 25
2.2臨時(shí)設(shè)施布置方案 26
2.3 擬投入的施工機(jī)械設(shè)備配置 26
2.3.1擬投入的主要施工機(jī)械設(shè)備表 27
2.3.2擬投入本工程主要檢測(cè)設(shè)備表 28
2.3.3施工工具的保管、發(fā)放、維修保障措施 29
2.4 本工程勞動(dòng)力配置及進(jìn)場(chǎng)時(shí)間安排 29
2.5 勞動(dòng)力計(jì)劃表 30
第三章 施工方案 31
3.1 施工工序 31
3.2 主要項(xiàng)目的施工工藝及技術(shù)交底 31
3.2.1天棚工程 31
3.2.1.1輕鋼龍骨石膏板吊頂施工 31
3.2.2.2輕鋼龍骨微孔鋁扣板天花吊頂施工 33
3.2.2墻柱面裝飾工程 33
3.2.2.1墻面磚施工 33
3.2.2.2干掛石材施工 36
3.2.2.3木裝修墻工程施工 37
3.2.2.4墻紙施工 38
3.2.2.5立柱不銹鋼、噴漆玻璃飾面施工 41
3.2.2.8玻璃隔斷制安工程 42
3.2.3地面裝修工程 43
3.2.3.1地磚鋪裝施工 43
3.2.3.2石材地面施工 45
3.2.3.3實(shí)木地板面層施工 46
3.2.3.4復(fù)合木地板施工 47
3.2.3.5樓面地膠鋪貼施工 49
3.2.5乳膠漆施工工藝 50
3.2.6金屬板加工及安裝 51
3.2.7門(mén)窗工程施工 53
3.2.8木飾面油漆施工 55
3.2.9電氣照明綜合布線(xiàn)工程 56
3.2.9.1施工順序 56
3.2.9.2電氣管線(xiàn)敷設(shè) 57
3.2.9.3電線(xiàn)管穿線(xiàn) 57
3.2.9.4電纜敷設(shè) 58
3.2.9.5配電箱安裝 58
3.2.9.6照明器具安裝 58
3.2.9.7系統(tǒng)調(diào)試方法 59
3.2.10給排水安裝工程 59
3.2.11直飲水工程專(zhuān)項(xiàng)施工方案 61
3.2.11.1概述 61
3.2.11.2設(shè)計(jì)思路 61
3.2.11.3施工部署 62
3.2.11.4技術(shù)要求及施工方法 63
3.2.11.5質(zhì)量安全措施 67
3.2.11.6主要設(shè)備材料清單表 68
3.2.12防白蟻施工 73
3.2.13衛(wèi)生間、廚房防水處理 74
3.2.14停車(chē)場(chǎng)設(shè)施安裝工程 76
第四章 施工進(jìn)度計(jì)劃 77
4.1施工進(jìn)度計(jì)劃 77
4.2工程開(kāi)竣工日期 78
4.3進(jìn)度計(jì)劃與工期安排協(xié)調(diào) 78
4.3.1進(jìn)度控制順利執(zhí)行的條件 79
4.3.2編制施工進(jìn)度表 80
4.4確保工期措施 81
4.5違約承諾 87
第五章 質(zhì)量保證措施 88
5.1工程質(zhì)量標(biāo)準(zhǔn)及承諾 88
5.2工程項(xiàng)目質(zhì)量管理體系 89
5.3工程質(zhì)量保證措施 89
5.4質(zhì)量管理職能 90
5.5半成品及成品保護(hù)措施 90
5.5.1保護(hù)職責(zé) 90
5.5.2保護(hù)方法 91
5.6質(zhì)量通病預(yù)防治措施 93
5.6.1石材地面接縫不平,板面紋理不順、色澤不勻 93
5.6.2瓷磚墻面空鼓、脫落 94
5.6..3瓷磚接縫不平直、縫子不均勻,踢腳線(xiàn)出墻厚度不一致 95
5.6.4木紋不順,飾面不平 96
5.6.5面層明釘缺陷 97
5.6.6木龍骨安裝缺陷 98
5.6.7油漆流墜 99
5.6.8窗扇關(guān)閉滲水 100
5.6.9坐便器安裝后滲漏、不穩(wěn) 100
第六章 安全生產(chǎn)保證措施 102
6.1 安全生產(chǎn)保證措施 102
6.2 項(xiàng)目安全管理體系 103
6.2.1 項(xiàng)目經(jīng)理職責(zé) 103
6.2.2 施工隊(duì)隊(duì)長(zhǎng)安全生產(chǎn)責(zé)任 104
6.2.3 施工隊(duì)及工地安全員的安全生產(chǎn)責(zé)任 104
6.2.4 班組長(zhǎng)(施工承包人)的安全生產(chǎn)責(zé)任 106
6.2.5 工地質(zhì)量員的安全生產(chǎn)責(zé)任 107
6.2.6 工地材料員安全職責(zé) 107
6.2.7 工人的安全職責(zé) 108
6.2.8 實(shí)行安全教育培訓(xùn)制度 109
6.2.9 安全技術(shù)交底制度 111
6.2.10 刷(噴)漿工程安全技術(shù)交底 112
6.2.11 油漆工程安全技術(shù)交底 112
6.2.12 圓鋸使用安全技術(shù)交底 113
6.2.13電焊工安全技術(shù)交底 114
6.2.14 電工安全技術(shù)交底 115
6.2.15 特種作業(yè)人員持證上崗制度 116
6.2.16 項(xiàng)目組安全檢查制度與實(shí)施細(xì)節(jié) 117
6.2.17 班前安全活動(dòng)制度 119
6.2.18 工傷事故報(bào)告處理規(guī)定 119
6.2.19 施工現(xiàn)場(chǎng)防火規(guī)定 121
6.2.20 施工現(xiàn)場(chǎng)用電管理規(guī)定 122
6.2.21 施工現(xiàn)場(chǎng)臨時(shí)用電規(guī)定 124
6.3安全事故預(yù)防措施 125
6.4消防管理措施 126
6.5安全用電技術(shù)措施 127
6.6現(xiàn)場(chǎng)安全、保衛(wèi) 129
第七章 文明施工措施 131
7.1 材料堆放管理 132
7.2 工地環(huán)境條件保護(hù) 133
7.3 生活區(qū)環(huán)境條件保護(hù) 133
7.4 文明施工改善措施 133
7.5 環(huán)境保護(hù)措施 134
7.6 噪聲控制與粉塵控制措施 134
第八章 交叉作業(yè)與協(xié)調(diào)管理 135
8.1交叉作業(yè)管理 135
8.2與業(yè)主、監(jiān)理、設(shè)計(jì)等單位合作關(guān)系處理 136
8.2.1與業(yè)主的關(guān)系處理 136
8.2.2與監(jiān)理具體工作程序 137
8.2.3與設(shè)計(jì)單位的合作關(guān)系處理 138
8.3施工內(nèi)外組織協(xié)調(diào) 138
第九章 文件、資料管理及歸檔 141
第十章 工程回訪(fǎng)和保修 142
10.1工程保修 142
10.2工程回訪(fǎng) 143
10.3保修服務(wù)承諾 144
第十一章 合理化建議 145
Construction Design
Directory
Project Overview Chapter 8
1.1 Project Overview 8
1.2 The quality of the project construction period and the Standard 8
1.3 Construction organization design based on 8
1.4 Basis of preparation of 10
1.5 shows the preparation of 11
Chapter 12 Construction and preparation guidelines
2.1 Project Construction to prepare 12
2.1.1 Technical Preparation 12
2.1.2 Construction of team approach to prepare 13
2.1.3 of the technical standards of professional workers in 13
2.1.3.1 Quality control measures for workers 14
2.1.3.2 to be used in the construction of this project to the professional management team and the related 15
2.1.3.3 on the technical standards of professional workers in 16
2.1.4 Management approach 18 workers
2.1.5 Site preparation 19
2.1.6 decoration materials to prepare 20
2.1.7 The approach to the material quality control 20
2.1.8 25 major material approach plan
2.2 Layout of 26 temporary facilities
2.3 to be configured into 26 construction machinery and equipment
2.3.1 The main construction to be put into machinery and equipment Table 27
2.3.2 The works to be put into the main testing equipment Table 28
2.3.3 construction tool storage, issuance, maintenance and support measures 29
2.4 The project labor allocation and scheduling approach 29
2.5 Labor 30 schedule
Chapter 31 construction program
31 3.1 Construction process
3.2 Construction of major projects and technical disclosure process 31
3.2.1 ceiling Engineering 31
3.2.1.1 plasterboard ceiling metal frame construction 31
3.2.2.2 Micro Lvkou Ban ceiling metal frame construction 33
3.2.2 cylinder wall decoration 33
3.2.2.1 Construction of 33 wall tile
36 3.2.2.2 Construction of Dry Stone
3.2.2.3 Construction of 37 wood-paneled wall
3.2.2.4 Construction of 38 wallpapers
3.2.2.5 Column stainless steel, paint finish construction of 41 glass
3.2.2.8 glass partition system safety engineering 42
43 3.2.3 Surface decoration
3.2.3.1 Brick Pavement 43
3.2.3.2 Construction of 45 ground stone
3.2.3.3 Surface Construction 46 solid wood flooring
3.2.3.4 Construction of composite wood flooring 47
3.2.3.5 Construction of the floor to glue Paving 49
Construction Technology 50 3.2.5 Paint
3.2.6 Metal plate processing and installed 51
3.2.7 door construction 53
3.2.8 Construction of 55 wood finishes paint
3.2.9 electrical lighting cabling engineering 56
3.2.9.1 Construction of the order of 56
3.2.9.2 laying of electrical lines 57
3.2.9.3 wire pipe threading 57
3.2.9.4 Cabling 58
3.2.9.5 Distribution box installation 58
3.2.9.6 Lighting Installation 58
3.2.9.7 system debugging method 59
3.2.10 for the installation of 59 drainage
3.2.11 Drinking Water Project Construction Scheme 61 special
3.2.11.1 Overview 61
3.2.11.2 design idea 61
3.2.11.3 Construction of the deployment of 62
3.2.11.4 63 technical requirements and construction methods
3.2.11.5 quality of safety measures 67
3.2.11.6 List of major equipment and materials Table 68
3.2.12 Construction of 73 termite
3.2.13 bathroom, kitchen, water treatment 74
3.2.14 installation of 76 car-parking facilities
Chapter 77 Construction Schedule
77 4.1 Construction Schedule
4.2 Project commencement and completion date of 78
4.3 The schedule and duration of the coordination arrangements 78
4.3.1 the conditions for the successful implementation of the progress of control 79
4.3.2 the preparation of the construction schedule of 80
Measures to ensure the schedule of 4.4 81
Breach of promise 87 4.5
Chapter 88 Quality assurance measures
5.1 Project quality standards and commitment to 88
5.2 Project Quality Management System 89
5.3 Project Quality assurance measures 89
5.4 Quality management functions 90
Semi-finished and finished products 5.5 90 protection
5.5.1 Protection of duty 90
5.5.2 Protection Methods 91
Governance measures to prevent quality problems 5.6 93
5.6.1 uneven stone floor joints, board texture flow, and color unevenness 93
5.6.2 tile wall void, or off 94
5.6 .. 3 ceramic tile joints are not straight, Nuiko uneven, the wall thickness of the baseboard 95 is inconsistent
5.6.4 grain flow, uneven finishes 96
5.6.5 Surface defects in 97 out nails
5.6.6 Installation of wood keel defects 98
5.6.7 paint flow fall 99
5.6.8 sash closed seepage 100
5.6.9 Toilet leaks after installation, unstable 100
Chapter 102 of safety assurance measures
Safety assurance measures 6.1 102
6.2 Project Safety Management System 103
6.2.1 Project Manager role 103
6.2.2 Construction Safety Team captain responsibilities 104
6.2.3 Construction site safety team and the safe production responsibility for 104 staff
6.2.4 team leader (construction contractor) responsibility for the safe production of 106
6.2.5 Members of the site quality and safe production responsibility 107
6.2.6 Members of the security responsibilities of the site materials, 107
6.2.7 the security responsibilities of 108 workers
6.2.8 the implementation of safety education and training system 109
6.2.9 Security System 111 Technology Details
6.2.10 brush (spray) 112 pulp Engineering Safety Technology Details
6.2.11 Paint Engineering Safety Technology Details 112
6.2.12 safe technical disclosure of 113 circular saw
6.2.13 114 welders Security Technology Details
6.2.14 Electrical Safety Technology Details 115
6.2.15 special operations personnel licensing system for 116
6.2.16 project team and implementation details of the security inspection system 117
6.2.17 system safety activities before classes 119
6.2.18 reports dealing with provisions of 119 accidents
6.2.19 121 construction site fire safety requirements
6.2.20 Power Management provides construction site 122
6.2.21 Power provides 124 temporary construction site
6.3 Safety measures for accident prevention 125
6.4 Fire management 126
6.5 Safety Measures Power 127
6.6 site security, security 129
Construction of measures under Chapter VII of Civilization 131
7.1 Materials Management 132 stacked
7.2 site environmental conditions to protect 133
7.3 Living environment protection zone 133
7.4 civilized construction improvements 133
134 7.5 Environmental Protection Measures
7.6 Noise control and dust control measures 134
Chapter VIII of the cross-operating with the coordination and management 135
8.1 Cross Operations Management 135
8.2 with the owners, supervision, design partnership deal with 136 units
8.2.1 deal with the relationship with the owners of 136
8.2.2 Specific procedures and supervision 137
8.2.3 and design partnership deal with 138 units
8.3 Construction organization and coordination within and outside the 138
Chapter IX documents, data management and archiving 141
Re-engineering and warranty Chapter 142
10.1 Engineering 142 warranty
Re 143 10.2 Engineering
10.3 144 warranty service commitment
Chapter XI 145 rationalization proposals
