重慶市長壽師范學校教學樓工程施工組織設計.doc
進入下載頁
第一章:工程概況
1.工程簡介
重慶市某師范學校教學樓工程位于某師范學校內,緊臨球場及原教學樓之間,為六~七層鋼筋混凝土框架結構,占地面積7474m2,總建筑面積7720m2。建筑高度25.2m。
該大樓的建成,將對改善某師范學校教學環境,提高教學質量起到很大的作用。
2.主要施工技術重點、難點:
根據我們多年以來積累的高層建筑施工經驗,我們將把邊柱垂直度和邊梁外邊線控制、現澆樓梯間垂直度控制、外墻裝飾質量作為本工程施工技術重點。
3.業主招標要求
3.1工期要求:無具體開工日期,竣工日期為2001年6月15日
3.2質量要求:優良
Chapter One: Project Overview
1. Project Description
Chongqing is located in a normal school teaching building project within a normal school, close to golf course and between the original school buildings, for the six ~ seven-story reinforced concrete frame structure, an area of 7474m2, total construction area of 7720m2. Building height 25.2m.
The completion of the building, will improve the teaching of a normal school environment, improving the quality of teaching played a significant role.
2. The main construction technology major and difficult:
Based on our accumulated many years experience in high-rise building construction, we will side columns and edge beams outside the vertical line of control, place stairways verticality control, external decorative quality of construction technology as the key.
3. Owners of the tender requirements
3.1 Duration Requirements: No specific start and completion dates for the June 15, 2001
3.2 Quality requirements: good
