軟土地基深墓坑大型地下室施工系列工法.doc
進(jìn)入下載頁
目 錄
l前言 2
2工法特點(diǎn)及主要內(nèi)容 2
3工藝流程 3
4系列工法 3
4.1施工測(cè)量工法 3
4.2深基坑支護(hù)工法 6
4.3地下水治理工法 10
4.4土方開挖與回填工法 13
4.5監(jiān)測(cè)與信息施工工法 16
4.6鋼筋制作、綁扎及大直徑Ⅲ級(jí)鋼筋連接工法 18
4.7大體積砼、大面積砼施工工法 21
5質(zhì)量與安全保證體系 24
CONTENTS
l Introduction 2
2 Characteristics and main contents of engineering methods 2
3 Process 3
4 Series 3 Engineering Method
4.1 Construction Surveying Engineering Method 3
4.2 Deep Foundation Construction Method 6
Construction method of groundwater management 4.3 10
4.4 earth excavation and backfill work law 13
4.5 Construction Method of Monitoring and Information 16
4.6 steel production, lashing and large diameter Ⅲ grade 18 steel bar construction method
4.7 mass concrete, large-scale concrete construction method 21
5 of 24 quality and safety assurance system
