1. <pre id="dbtbd"></pre>
      精品国产免费一区二区三区香蕉,久久国产乱子精品免费女,av午夜福利一片免费看久久,精品国产午夜福利在线观看,日本久久99成人网站,日本不卡一区二区三区在线,全国最大成人网,国产精品一二二区视在线

      某小區(qū)西區(qū)15 17 20#住宅樓工程--雨季施工方案.doc

      更新時間: 2024-02-18
      下載權(quán)限: 免費(fèi)會員
      文件大小: 0.01 MB
      文件類型: .doc
      瀏覽次數(shù):
      上傳會員: lajks
      所屬欄目: 施工方案
      進(jìn)入下載頁
      資料簡介

      一、工程概況
      本工程位于×××××小區(qū)西區(qū)15、17、20#住宅樓工程位于北京市××區(qū)××村。北臨規(guī)劃××二號路。總建筑面積為50803m2。地下二層為五級普通人防,地下一層為設(shè)備間、自行車庫和管理用房,地上為住宅。
      北京市地區(qū)的雨季施工為6月-8月,該季節(jié)的歷史平均降雨量為423mm,占北京市年平均降雨量的74%。期間有數(shù)次的大到暴雨天氣,局部地區(qū)可能出現(xiàn)洪澇災(zāi)害。因此雨季施工時,應(yīng)與當(dāng)?shù)貧庀蟛块T密切聯(lián)系,注意收聽當(dāng)?shù)靥鞖忸A(yù)報,做好預(yù)防準(zhǔn)備工作。
      二、雨季施工原則
      本工程雨季施工階段要完成主體結(jié)構(gòu)和二次結(jié)構(gòu)的施工。施工任務(wù)繁重,為確保工程質(zhì)量,搞好安全生產(chǎn),保證各項計劃指標(biāo)任務(wù)的完成,必須從思想上、組織上、措施上、物資上盡早做好充分準(zhǔn)備,做到思想落實(shí)、組織落實(shí)、措施落實(shí)、物資落實(shí)、汛期施工做到有備無患,雨季施工總的原則是“做好排水、擋水、防水工作”,總的要求是,室內(nèi)工程雨季不影響施工,室外工程小雨不間斷施工,大雨期間暫停施工,大雨過后即可施工,暴雨過后不影響施工。
      三、施工準(zhǔn)備
      3.1 組織準(zhǔn)備
      為了保證在雨季施工期間,在發(fā)生大雨、暴雨天氣等險情時,能夠及時組織人員進(jìn)行搶險救災(zāi),成立雨季施工領(lǐng)導(dǎo)小組。
      組長:×××
      副組長:×××、×××
      組員:×××、×××、×××、×××、××、×××、××、×××
      3.2 材料準(zhǔn)備 序號 材料名稱 單位 數(shù)量 備注 1 雨衣雨褲 套 200 2 雨鞋 雙 200 3 污水泵 臺 8 4 塑料布 M2 1500 5 鐵鍬 只 100 6 手推車 輛 30 7 防水電纜 m 500 8 編制袋 個 1000   3.3 技術(shù)準(zhǔn)備
      雨季到來之前,組織有關(guān)人員按照方案要求進(jìn)行技術(shù)交底,提出雨施計劃,為施工提供技術(shù)準(zhǔn)備。
      3.4 現(xiàn)場準(zhǔn)備
      First, project survey
      The project is located ××××× Western 15,17,20 # residential building residential project in the District, Beijing, × × × × village. × × II Road north plan. The total construction area of 50803m2. Basement level for the five common air defense, ground floor for the equipment, the bike library and administration buildings, land for residential.
      Construction of Beijing area during the rainy season in June -8 for the month, the season's historical average rainfall 423mm, mean annual precipitation in Beijing accounted for 74%. There have been several rounds of heavy rain the weather, flooding may occur in some areas. Therefore, construction during the rainy season, should be closely linked with the local meteorological department, pay attention to listen to local weather forecasts, preventive preparations.
      Second, the construction principle of the rainy season
      Construction phase of this project to be completed during the rainy season the main structure and secondary structure of the project. Heavy construction tasks, in order to ensure the quality, improve safety, ensure that the plan targets completion of the task, must be ideologically, organizationally, measures and material as soon as possible fully prepared to do to implement it, the organization and the measures implemented, the implementation of materials, construction prepared and flood season, the rainy season the general principle of construction is "good drainage, retaining, waterproof work", the general requirement is that the rainy season does not affect the construction of indoor projects, outdoor projects ongoing construction of light rain, heavy rain During the suspension of construction, the construction can be heavy rain, rainstorm does not affect the construction.
      Third, construction preparation
      3.1 Organization of preparation
      To ensure the construction period in the rainy season, in the event of heavy rain, heavy rain and other dangerous situations, the timely rescue and relief organization personnel, the establishment of the Leading Group for Construction during the rainy season.
      Leader: × × ×
      Deputy head of the :×××,×××
      Crew :×××,×××,×××,×××,××,×××,××,×××
      3.2 Materials preparation material name number number of units Note 1 raincoat rain boots rain pants sets 2002 double 2003 sewage pump station 84 plastic sheeting M2 1500 5 100 6 spade only waterproof cable trolley car 307 m 500 8 1000 3.3 Technical preparation of bags were ready
      Before the rainy season, were organized to carry out technical disclosure in accordance with program requirements, make rain facilities plan to provide technical preparations for the construction.
      3.4 site preparation
       

      下載地址

      前往下載

      主站蜘蛛池模板: 老湿机69午夜福利区| 免费啪视频观在线视频浴室| 国产无套白浆一区二区| 日韩欧美精品一中文字幕| 国产中文99视频在线观看| 无码人妻丝袜在线视频| 国产成人精品亚洲午夜| 日韩欧美中文字幕在线精品| 91老肥熟女九色老女人| 亚洲中文字幕无码一久久区| 好男人社区www在线观看| 亚洲国产午夜精品乱码| 亚洲午夜精品久久久久久抢| 99国产欧美另类久久久精品| 久久综合五月丁香六月丁香| 亚洲福利精品一区二区三区| 国产成人av| 亚洲春色在线视频| 国产精品一区高清在线观看| 亚洲精品乱码久久久久66| 尤物视频在线免费观看| 国产午夜福利一区二区三区 | 欧美成人午夜精品免费福利| 无码3p| 成人午夜福利视频一区二区| 久久久2019精品视频中文字幕| 亚洲AV无码一区二区二三区我 | 久久一区二区中文字幕| 九九热精品在线观看| 国产成人AV乱码免费观看| 男人的天堂色偷偷| 女人AV天堂| 久久成片| 最新精品露脸国产在线| 亚洲人成在久久综合网站| 国产情侣激情在线对白| 91孕妇精品一区二区三区| 91欧洲在线视精品在亚洲| 色婷婷av久久久久久久| 性欧美videoshd| 国产成人精品一 二区|