      土建工程施工方案
          1、施工測量
      建筑物定位放線、高程控制等施工測量均應分別記錄測量成果,經業主或監理單位復核認可后,方可進行下道工序施工。
      1.1建筑物定位放線
      根據業主提供的坐標,用經校驗合格的GJ2光學經緯儀采用直角坐標法測設出建筑物平面控制網,并在控制網頂點設置半永久性控制樁,用砼予以保護。根據建筑物施工平面圖,用同樣方法將主軸線定于控制網上。縱、橫向各設2條和4條主軸線,每條軸線為4個標識點,從而形成施工測量控制網,用以作為基礎定位放線依據,其誤差控在1/2000范圍之內。
      1.2軸線控制:
      根據施工平面圖和主軸線,利用經緯儀和鋼尺分別用直角坐標法和內分法測定條基中心線,各開間軸線用鋼卷尺量定。測設時,按常規方法進行復核,使之閉合差不超過規范規定。
      1.3標高控制:
      根據建設方給定的水準點,用經校驗的DS3水準儀進行高程測設,在擬建房屋周圍的原有建筑物陽角引測 ±0.00m控制點,標高傳遞采用經檢定的鋼卷尺沿墻角自±0.00M標高向上丈量傳遞,下部引上標高點不少于3點,對引上的標高用水準儀閉合,作為該標高點,測量成果記錄必須及時請建設單位復查簽字。
      2、基礎工程
      2.1場地平整及清理地下障礙物
      本工程大部份座落在回填土上。工程
      Civil engineering construction plan
          1, construction survey
      Building orientation and setting out, construction survey elevation control the outcome should be measured were recorded by the owner or authorized supervisory agencies for review only after the processes the next construction.
      1.1 Building Orientation-off
      According to owners of coordinates, after checking with a qualified GJ2 optical theodolite method to measure the use of a Cartesian coordinate plane control placed on buildings, and control network of semi-permanent control vertices piles, with concrete to be protected. According to the building construction plan, the main axis with the same method will be to control the Internet. Vertical, horizontal, each with two and four main axes, each axis for the four identified points, creating construction survey control network, used as a basis for positioning discharge line basis, and the error control in the 1 / 2000 range.
      1.2 Axis Control:
      According to the construction plan and the main axis, respectively, using theodolite and steel rule with Cartesian method and the method section within the sub-base center line axis of the bay steel tape volume set. Layout of the time, according to conventional methods of review, so that difference does not exceed specification closure.
      1.3 Elevation Control:
      According to the standard construction side for a given point, with the water level by checking the DS3 test set for elevation, the proposed housing in existing buildings around the cape of lead measured ± 0.00m control point, elevation pass through test using steel tape measure along the corner measured from ± 0.00M elevation pass up, the lower elevation point lead on at least 3 points on the lead with a water level elevation on the closure, as the elevation point, measuring the results records must be signed in a timely manner, please review the construction unit.
      2, basic engineering
      2.1 site formation and clearance of underground obstacles
      Most of this project is located in the backfill. Project
       

      下載地址

      前往下載

      主站蜘蛛池模板: 激情五月开心婷婷深爱| 色www永久免费视频| 久久国产精品老人性| www.中文无码| 亚洲欧美香港在线观看三级片 | 亚洲人妻中文字幕在线视频 | 日韩一区中文字幕久久| 看亚洲黄色不在线网占| 国产精品视频白浆免费视频| 影音先锋成人资源| 伊人狼人色| 一本久道综合在线无码88| 91精品亚洲一区二区三区| 亚洲欧美日韩高清综合678| 亚洲精品第一| 久久亚洲AⅤ无码精品午夜麻豆| 国产999久久高清免费观看| 婷婷伊人綜合中文字幕小说| 动漫精品专区一区二区三区不卡| 日产精品99久久久久久| 日本噜噜影院| 曲阳县| 国产av国片精品一区二区| 久青草精品视频在线观看| 色橹橹欧美在线观看视频高清| 操碰在线视频| 中文字幕天天躁日日躁狠狠躁免费| 日韩一区二区三区日韩精品| 国产桃色在线成免费视频| 极品尤物美乳在线观看| 一区二区亚洲精品国产精| 成人性爱视频在线观看| 日韩精品av免费在线观看| 色综合久久网| 深夜av在线免费观看| 亚洲色成人www永久网站| 久久国产成人午夜av影院| 白嫩日本少妇做爰| 午夜爽爽爽男女免费观看影院| 精品 无码 国产观看| 欧美中文字幕人妻系列|