北京地鐵五號線01標段站前廣場施工方案.doc
進入下載頁
一、編制依據
1、現有施工圖紙
2、有關技術、施工操作規范
序號 規范名稱 規范編號
1 華北地區建筑標準通用圖集 88J1-1
2 華北地區建筑標準通用圖集 88J9
3 華北地區建筑構造通用圖集
4 城市綠化工程施工及驗收規范
5 混凝土質量控制標準
6 建筑施工質量驗收統一標準
7 建筑地面工程施工質量驗收規范
8 建筑地面設計規范
3、現場施工情況
4、北京市文明施工管理規定
二、工程概況
1、工程地點:北京市豐臺區南三環路劉家窯橋
2、工程名稱:北京地鐵五號線劉家窯站出入口站前廣場工程
3、工程概況:本工程設計總面積為10958.64(平方米),共分為四個區
第一區:東南出入口站前廣場(2025.22平方米)(其中含硬化后歸還870.18平方米),包括站前廣場鋪裝、停車場鋪裝、綠化。
第二區:東北出入口站前廣場(1591.31平方米),包括站前廣場鋪裝、停車場鋪裝、綠化。
第三區:西南出入口站前廣場(2277.70平方米)(其中含綠化后歸還1117.30平方米),包括站前廣場鋪裝、停車場鋪裝、綠化。
第四區:西北出入口站前廣場(5063.41平方米),包括站前廣場鋪裝、停車場鋪裝、綠化。
三、施工部署
1, prepared on the basis
1, the existing construction drawings
2, the technical, construction operations specifications
Name Authority ID number specification
A common building standards in North China Atlas 88J1-1
2 building standards in North China General Atlas 88J9
3 Universal Atlas of building construction in North China
4 urban greening project construction and acceptance
5 concrete quality control standards
6 Construction Quality Check
7 Ground Engineering Construction Quality Acceptance
8 floor building design
3, on-site construction of
4, Beijing civilized construction regulations
Second, project profiles
1, Engineering Location: Beijing Fengtai District South Third Ring Road Liujiayao Bridge
2, Project Name: Beijing Subway Line Liujiayao entrances Station Square project
3, Project Overview: The total area of 10,958.64 Engineering Design (square meters), divided into four areas
First District: Southeast entrance Station Square (2025.22 m2) (which included the return of 870.18 square meters after curing), including Station Square paving, parking lot paving, green.
Second District: Northeast entrance Station Square (1591.31 square meters), including Station Square paving, parking lot paving, green.
Third District: Southwest entrance Station Square (2,277.70 m2) (which, after the return of 1117.30 square meters with green), including Station Square paving, parking lot paving, green.
Fourth District: Northwest entrance Station Square (5063.41 square meters), including Station Square paving, parking lot paving, green.
Third, construction deployment
