威海市萬達生活小區(qū)施工組織設計.doc
進入下載頁
目錄
一、編制依據(jù)
二、工程概況
三、工程自然條件
四、施工進度計劃
五、工程施工管理目標確定
六、施工部署
七、勞動力需用量計劃
八、機械設備需用量計劃
九、施工準備
十、施工總平面布置
十一、主要分部分項工程施工方法
十二、冬期、雨期施工措施
十三、各項組織保證措施
1、質量管理措施
2、職業(yè)健康/安全管理措施
3、文明施工管理措施
4、環(huán)境保護措施
5、消防措施
6、預防傳染病措施
十四、“四新”技術應用
十五、工程回訪與保修
十六、 以下是附圖和附表
Directory
1, prepared on the basis
Second, project profiles
Third, project the natural conditions
Fourth, the construction schedule
5, targeting construction management
6, construction deployment
7, the amount of labor required to plan
8, mechanical equipment required amount of program
9, construction preparation
10, construction general layout
11, part of the main sub-project construction method
12, winter, rain on the construction measures
13, the organization assurance measures
1, Quality management
2, occupational health / safety measures
3, civilized construction management
4, environmental protection measures
5 Fire fighting measures
6, disease prevention measures
14, "four new" technology
15, re-engineering and warranty
16, the following are photos and details