鋼筋制作、安裝工程安全作業(yè)交底.doc
進(jìn)入下載頁(yè)
內(nèi)容摘要:
1、 進(jìn)入施工現(xiàn)場(chǎng)必須遵守安全生產(chǎn)的各項(xiàng)規(guī)章制度和紀(jì)律等。
2、 鋼筋斷料、配料、彎料等工作應(yīng)在地面進(jìn)行,不準(zhǔn)在高空操作。
3、 搬運(yùn)鋼筋要注意附近有無(wú)障礙物、架空電線(xiàn)和其它臨時(shí)電氣設(shè)備,防止鋼筋在回轉(zhuǎn)時(shí)碰撞電線(xiàn)或發(fā)生觸電事故。
4、 現(xiàn)場(chǎng)綁扎懸空大梁鋼筋時(shí),不得站在模板上操作,必須在腳手板上操作。
5、 綁扎3m以上獨(dú)立柱鋼筋時(shí),必須搭設(shè)操作平臺(tái)。
6、 不準(zhǔn)站或坐在柱箍筋上綁扎,也不準(zhǔn)將木料、管子、鋼模板穿插在鋼箍上作立人板。
7、 起吊鋼筋骨架,下方禁止站人,必須待骨架降到距模板1m以下才準(zhǔn)靠近,就位支撐好后方可摘鉤。
8、 起吊鋼筋時(shí),規(guī)格必須統(tǒng)一,不準(zhǔn)長(zhǎng)短參差不一,細(xì)長(zhǎng)鋼筋不準(zhǔn)一點(diǎn)吊。
9、 切割機(jī)使用前,須檢查機(jī)械運(yùn)轉(zhuǎn)是否正常,有否二級(jí)漏電保護(hù);切割機(jī)后方不準(zhǔn)堆放易燃物品。
10、鋼筋頭子應(yīng)及時(shí)清理,成品堆放應(yīng)整齊,工作臺(tái)要穩(wěn),鋼筋工作棚照明燈必須加網(wǎng)罩。
11、高空作業(yè)時(shí),不得將鋼筋集中堆在
Abstract:
1, into the construction site must comply with safety rules and regulations and discipline.
2, steel cutting, ingredients, materials, etc. should be bent on the ground were not allowed to operate at high altitude.
3, moving near the bar to pay attention to whether the barrier, temporary overhead lines and other electrical equipment to prevent the steel wires in the rotation when the collision occurred or electric shock.
4, left vacant spot beam steel banding shall not stand in the template to operate, must operate in the scaffold board.
5, 3m or more independent column steel banding must be erection platform.
6, allowed to stand or sit on the Binding column stirrup, or brigadier general timber, pipe, steel template inserted a steel hoop to make Liren board.
7, lifting steel frame, below the ban stand, must be dropped from the skeleton template 1m the following before they close, good support in place only after uncoupling.
8, lifting bar, the specifications must be unified, not allowed to vary in length, slender steel are not allowed to hang a little.
9, cutting machine before use, to check the machine is functioning properly, it has two leakage protection; cutting machine behind the combustible materials are not allowed to pile up.
10, reinforced head should be cleared up, finished products should be neatly stacked, tables should be stable, reinforced the work of studio lighting to increase the guard.
11, high-altitude operations, shall focus on the heap will be reinforced in