      安全交底內容:
      1、 必須按施工組織設計進行施工。
      2、 搭設、拆除腳手架必須戴安全帽及穿軟底鞋。
      3、 外墻腳手架必須在主體結構施工以前搭設,并按照有關規定搭設安全檔板或者安全網;腳手架應高出工作面1.2M以上。
      4、 用于連接大橫桿的對接扣件,應避免開口向上設置,防止雨水侵入。
      5、 腳手架分段或搭設完畢,須經施工負責人、質安員驗收合格后,方可使用;高層建筑的外墻腳手架要采取卸荷措施。
      6、 在大風雨或停工一段時間后、應對腳手架進行全面檢查,如發現變形、下沉、鋼構件銹蝕嚴重,連接扣松脫等,要及時加固維修后方可使用。
      7、 拆除腳手架應設圍欄,拆除工作應由上而下,一步一清,不準上下同時作業,拆除物件不得往下投擲。
      8、 拆除大橫桿、剪刀撐時應先拆中間扣,再拆兩頭扣,由中間操作人員往下順傳竹桿。
      9、 遇大雨、雷、五級以上及夜間不得作業。
      用Φ6鋼筋預埋砼梁外邊,每3米水平設一道,待砼梁板拆除后,收緊鋼筋,再加回頭頂。
      Security cards on the table contents:
      1, must be constructed according to the construction organization design.
      2, erection, dismantling scaffolds must wear a helmet and wear soft-soled shoes.
      3, external scaffolding must be before the main structure construction, erection, and erection of security in accordance with relevant provisions of the tailgate or the safety net; scaffold should be higher than face 1.2M.
      4, a large bar for connecting the docking fasteners, should be set up to avoid openings to prevent water intrusion.
      5, section or scaffolding erection is completed, subject to construction of person in charge of quality inspection and acceptance by security guards only after use; high-rise building external scaffolding unloading measures to be taken.
      6, when the storm or after a period of suspension of work, scaffolding should conduct a comprehensive inspection, if found deformation, subsidence, severe corrosion of steel components, connecting buckle loose, they have to be repaired in time to use reinforcement.
      7, removal of the fence should be set up scaffolding, demolition work should be top-down, step one clear, closed down operations at the same time, removal of objects not throw down.
      8, removal of a large bar, scissors should be removed first, middle button, and then split two buttons, the operator by the middle of bamboo down the smooth transfer.
      9, heavy rains, thunder, and night shall not work more than five.
      Reinforced concrete beam embedded with Φ6 outside, set a level of 3 meters each, to be removed after the concrete slab, to tighten the steel, coupled back to top of the head.
       

      下載地址

      前往下載

      主站蜘蛛池模板: 无码专区人妻系列日韩视频| 福利写真视频一区二区| 亚洲人成电影网站 久久影视| 影音先锋91| 欧美www在线观看| 亚洲制服丝袜| 久久精品国产久精国产果冻传媒| 久久中文字幕无码专区| 无遮无挡非常色的视频免费| 亚洲精品乱码久久久久久蜜桃91| 宝贝腿开大点我添添公视频免| 国产精品美女一区二三区| 久久国产精品麻豆映画| 久久96热在精品国产高清| 日韩中文字幕亚洲精品| 亚洲乱码一二三四区| 免费无码成人av在线播放不卡| 日本大片在线看黄a∨免费| 在线免费观看毛片av| 亚洲精品92内射| 一区二区福利在线视频| 久久精品国产www456c0m| 在线色综合| 四虎精品一区二区三区| 91n在线观看| 国产性色的免费视频网站| 深夜福利电影在线观看| a男人的天堂久久a毛片| 亚洲成a人片在线播放观看国产| 亚洲肥老太bbw中国熟女| 亚洲熟女乱综合一区二区| 国产熟女少妇| 成人亚洲色| 亚洲AV永久无码一区二区三区| 撕开奶罩揉吮奶头高潮av| 国产精品亚洲一区二区在| 久久99人妻无码精品一区| 国产偷窥熟妇高潮呻吟| 欧美a视频| 国内永久福利在线视频图片| 骚虎在线永久视频免费观看|