      安全交底內容:
      1、 必須按施工組織設計進行施工。
      2、 搭設、拆除腳手架必須戴安全帽及穿軟底鞋。
      3、 外墻腳手架必須在主體結構施工以前搭設,并按照有關規定搭設安全檔板或者安全網;腳手架應高出工作面1.2M以上。
      4、 用于連接大橫桿的對接扣件,應避免開口向上設置,防止雨水侵入。
      5、 腳手架分段或搭設完畢,須經施工負責人、質安員驗收合格后,方可使用;高層建筑的外墻腳手架要采取卸荷措施。
      6、 在大風雨或停工一段時間后、應對腳手架進行全面檢查,如發現變形、下沉、鋼構件銹蝕嚴重,連接扣松脫等,要及時加固維修后方可使用。
      7、 拆除腳手架應設圍欄,拆除工作應由上而下,一步一清,不準上下同時作業,拆除物件不得往下投擲。
      8、 拆除大橫桿、剪刀撐時應先拆中間扣,再拆兩頭扣,由中間操作人員往下順傳竹桿。
      9、 遇大雨、雷、五級以上及夜間不得作業。
      用Φ6鋼筋預埋砼梁外邊,每3米水平設一道,待砼梁板拆除后,收緊鋼筋,再加回頭頂。
      Security cards on the table contents:
      1, must be constructed according to the construction organization design.
      2, erection, dismantling scaffolds must wear a helmet and wear soft-soled shoes.
      3, external scaffolding must be before the main structure construction, erection, and erection of security in accordance with relevant provisions of the tailgate or the safety net; scaffold should be higher than face 1.2M.
      4, a large bar for connecting the docking fasteners, should be set up to avoid openings to prevent water intrusion.
      5, section or scaffolding erection is completed, subject to construction of person in charge of quality inspection and acceptance by security guards only after use; high-rise building external scaffolding unloading measures to be taken.
      6, when the storm or after a period of suspension of work, scaffolding should conduct a comprehensive inspection, if found deformation, subsidence, severe corrosion of steel components, connecting buckle loose, they have to be repaired in time to use reinforcement.
      7, removal of the fence should be set up scaffolding, demolition work should be top-down, step one clear, closed down operations at the same time, removal of objects not throw down.
      8, removal of a large bar, scissors should be removed first, middle button, and then split two buttons, the operator by the middle of bamboo down the smooth transfer.
      9, heavy rains, thunder, and night shall not work more than five.
      Reinforced concrete beam embedded with Φ6 outside, set a level of 3 meters each, to be removed after the concrete slab, to tighten the steel, coupled back to top of the head.
       

      下載地址

      前往下載

      主站蜘蛛池模板: 虎白女粉嫩尤物福利视频| 欧美性xxxxx极品| 欧美老肥妇做爰bbww| 欧美疯狂爱爱xxxxbbbb| 在线a亚洲v天堂网2018| 色噜噜人妻丝袜AⅤ资源| 亚洲精品久久婷婷丁香51| 97人妻一二三四| 亚洲欧美国产另类视频| 天天爽夜夜爽人人爽曰| 色伊人亚洲| 三上悠亚网站在线观看一区二区 | 亚洲情人网| 四虎精品国产AV二区| 国产亚洲一二三区精品| 女人洗澡一级毛片一级毛片| 深夜在线观看免费av| 久久久久久久久久8888| 狠狠人妻久久久久久综合老师| 亚洲欧洲另类春色校园小说| 亚洲自在精品网久久一区| 男人午夜视频在线观看免费| 国语精品自产拍在线观看网站| 精品偷自拍另类精品在线| 无码人妻精品丰满熟妇区| 手机无码人妻一区二区三区免费| 亚洲精品中文av在线| 爱操影院| 亚洲色无码刚才一区| 久久久久久午夜精品| 在线观看人成视频免费| 国产人妻另类综合专区| 国产精品午夜福利导航导| 亚洲爱婷婷色婷婷五月 | 日本黄色一区二区三区四区| 人人肏| 18岁以下禁止看很黄的视频在线观看| 亚洲天堂二区| 东方成人AV在线| 国产精品无码翘臀在线看纯欲 | 亚洲国产成人久久综合同性|