重慶XX隧道施工組織設(shè)計(jì).doc
進(jìn)入下載頁
本工程是為了改善XX縣城內(nèi)的交通條件而設(shè)計(jì),在紅星廣場與縣汽車站之間修建,將來形成快速通道。隧道全長402.33m,凈寬10m,凈高6.73m,半園拱形斷面,曲墻加仰拱(僅Ⅳ類圍巖地段無仰拱),洞門為端墻式。洞內(nèi)縱坡I=4.4%,受兩端連接道路標(biāo)高及地形控制無法降低,進(jìn)出口路面設(shè)計(jì)高程相對高差17.703m,為一超規(guī)范要求坡限的單洞雙車道隧道。本工程包括洞口工程、洞身工程、路面工程、裝飾工程,照明工程等項(xiàng)。地震烈度按6度設(shè)防。
XX of this project is to improve traffic conditions within the county seat design, in the Red Square, built between the bus station and the county, will form a fast-track. Tunnel length 402.33m, net width 10m, ceiling height 6.73m, half garden arch section, curved walls plus invert (only Ⅳ surrounding Lot no invert), Portal for the side wall. Cave longitudinal I = 4.4%, subject to both ends of the link road and terrain elevation control can not be reduced, import and export of pavement elevation relative height 17.703m, regulatory requirements for a super single-slope limit of two-lane tunnel hole. The project includes construction hole, hole body works, road construction, decoration, lighting other items. Seismic fortification intensity by 6 degrees.
