1. <pre id="dbtbd"></pre>
      精品国产免费一区二区三区香蕉,久久国产乱子精品免费女,av午夜福利一片免费看久久,精品国产午夜福利在线观看,日本久久99成人网站,日本不卡一区二区三区在线,全国最大成人网,国产精品一二二区视在线
      建虎網(wǎng) 節(jié)省時(shí)間成本,讓工作學(xué)習(xí)變得更高效!www.hanshuaijie.cn

      土石方開挖施工技術(shù)交底記錄.doc

      更新時(shí)間: 2024-02-29
      下載權(quán)限: 免費(fèi)會員
      文件大小: 0.01 MB
      文件類型: .doc
      瀏覽次數(shù):
      上傳會員: 龍龍
      所屬欄目: 路橋技術(shù)交底
      進(jìn)入下載頁
      資料簡介

      交底內(nèi)容:
      1、開挖前應(yīng)對開挖區(qū)域的原地形進(jìn)行復(fù)測、拍照、報(bào)監(jiān)理審批,作為工程量計(jì)量的依據(jù)。
      2、開挖前先作好排水設(shè)施,保證土石方工程排水順暢。
      3、挖土應(yīng)由邊到中,分層循序進(jìn)行。當(dāng)開挖至接近路基設(shè)計(jì)頂面時(shí),應(yīng)根據(jù)土質(zhì)情況注意預(yù)留碾壓沉落高度,其數(shù)值可通過試驗(yàn)確定。
      4、路基的尺寸和高程必須符合圖紙要求,不得超挖,同時(shí)應(yīng)根據(jù)施工需要增加工作面寬度。
      5、地基的任何部分受到擾動或損壞時(shí),按照監(jiān)理工程師的要求予以超挖。
      6、開挖完后路基要進(jìn)行平整、碾壓。路基壓實(shí)采用重型擊實(shí)標(biāo)準(zhǔn),路塹以下深度0~30cm內(nèi)路基壓實(shí)度要求達(dá)到95%。如達(dá)不到壓實(shí)標(biāo)準(zhǔn)時(shí),要進(jìn)行換土處理。
      7、整個施工期間,始終對所有挖方和路堤的工程邊坡、路拱和排水溝進(jìn)行修筑,并予以養(yǎng)護(hù)來保證滿足排水的要求。
      8、路基在開挖過程中,若遇軟弱地層或障礙物,需采取特殊措施時(shí),應(yīng)與監(jiān)理工程師和設(shè)計(jì)部門商討處理。
      Cards on the table contents:
      1 excavation area before the excavation should retest the original terrain, taking photographs, newspaper supervisory approval, as the basis for measuring quantities.
      2, make drainage facilities before excavation, earth works to ensure smooth drainage.
      3, by the side of the excavation, the layered sequentially. When the excavation to the top surface close to the design of embankment should be compacted under the sink soil conditions allow a high degree of attention, its value can be determined through experiments.
      4, the roadbed must meet the size and elevation drawings shall not exceed dug, and construction should be increased face width.
      5, the foundation of any part of the disturbed or damaged, according to the requirements of supervision engineers to be super-dig.
      6, finished roadbed excavation to finish, rolling. Compaction by heavy compaction standards, the following cutting depth of 0 ~ 30cm subgrade compaction requirements within 95%. If not meet compaction standards, the need for changing soil.
      7, during the construction period, and always for all excavation and embankment slope, road humps and drains were built, and be guaranteed to meet the water conservation requirements.
      8, roadbed in the excavation process, In case of soft ground or obstacles, need to take special measures, should be supervision of engineers and design departments to discuss treatment.
       

      下載地址

      前往下載

      主站蜘蛛池模板: 国产无遮挡裸体免费久久| a级亚洲片精品久久久久久久| 国产精品午夜无码AV在线播放| 波多野结衣免费一区视频| 国产老妇伦国产熟女老妇高清| 在线观看无码av五月花| 日韩视频中文字幕专区| 色中色综合一区| 日韩精品一二区在线视频| 久久婷婷五月综合色欧美| 日日噜噜噜夜夜爽爽狠狠视频| 内射干少妇亚洲69XXX| 3P无码| 天堂网av2014| 素人约啪| 日本高清中文字幕一区二区三区| 福利成人午夜国产一区| 国产欧美久久久久久| 久久亚洲国产中v天仙www| 亚洲精品一区久久久久一品av| 激情国产一区二区三区四区| 野外做受又硬又粗又大视频| 国产做a爱视频免费无遮挡 | 亚洲精品一二三四区| 国产欧美综合在线观看第七页| 日韩精品人妻中文字在线| 日本成片网| 国产又黄又硬又湿又黄的视| 最近中文国语字幕在线播放| 久久国产精品老人性| 国产在线第四页| 欧美69视频| 国产精品免费观看色悠悠| 人妻一区二区三区三区| 精品人妻少妇| 国产一区二区三区四区| 香蕉久草| 精品人妻中文字幕在线| 亚洲天堂精品一区| 久久精品蜜芽亚洲国产AV| 美女无遮挡被啪啪到高潮免费|